    Medical Decommission & Office Relocation36 locations + HQ30 days

    RediClinic (Rite Aid)

    ~20,000 square foot medical decommission & office relocation in Houston, TX — completed in 30 days.

    Overview

    A two-phase, multi-city project spanning RediClinic's Houston HQ office relocation and the full-scale decommission of all 36 RediClinic locations inside H-E-B stores across Houston, Austin, and San Antonio. When Rite Aid abruptly shut down every RediClinic in Texas on August 13, 2020 — in the middle of the COVID-19 pandemic — Corporate Relocators deployed 4 crews simultaneously to begin IT equipment removal across 22 Houston-area locations, then continued through Austin and San Antonio. The scope included removing all interior and exterior signage (backlit channel letters, Lexan panels, street pylons, 40 mounted TVs, 36 wall-mounted tablets, 90 framed signs), stripping vinyl wall graphics at 20 locations, removing all furniture, medical equipment, and supplies, shipping servers to Rite Aid's corporate office, constructing walls and doors at 33 locations, and restoring every clinic to white box condition — all coordinated store-by-store with H-E-B management across 21 cities.

    The Challenge

    Decommissioning 36 medical clinics inside active H-E-B grocery stores across 21 cities and 3 metro areas — each requiring OSHA-compliant scaffolding, boom lifts, and scissor lifts for signage removal while maintaining safe conditions for store customers and staff. Every location had unique signage configurations, wall damage unknowns beneath vinyl graphics, and required individual coordination with H-E-B store managers. RediClinic had served nearly 1.5 million patients since 2005 before Rite Aid's sudden closure.

    Our Solution

    Deployed 4 simultaneous crews for rapid IT equipment removal across all Houston locations on Day 1, followed by a systematic 2-locations-per-day schedule for signage removal and decommission across all 3 markets over 30 days. Used ladder trucks and boom lifts for exterior signage, OSHA-approved scaffolding for interior work, and 3M blockout vinyl film on shared street pylons to avoid replacing other tenants' graphics — a significant cost savings for H-E-B. Coordinated wall and door construction at 33 locations to restore the sales floor to white box condition.

    The Result

    All 36 RediClinic locations across Houston, Austin, and San Antonio fully decommissioned — signage removed, furniture and medical equipment cleared, IT equipment shipped to Rite Aid, vinyl graphics stripped, walls and doors constructed at 33 locations, and every clinic restored to white box condition, on schedule and coordinated with H-E-B across 21 cities.

    36 locations + HQ

    Total Space

    30 days

    Completion Time

    0

    Days Downtime

    100%

    Client Satisfaction

    Free Walkthrough

    Request a Free Walkthrough

    Tell us about your move and we'll reach out within a few hours to schedule a walkthrough. No pressure, no commitment.

    Les Badgett, Co-Founder & Executive Vice President of Corporate Relocators

    Talk to Les directly — Co-Founder & Executive Vice President

    832-512-0590 Les@crprelo.com
    "Excellent customer service and great communication throughout our move. Will definitely be using them again!"
    — Kaylee Satterfield
    4.1 on Google

    What to expect

    1. 1
      We reach out within a few hours

      A team member will call or text to confirm your walkthrough time.

    2. 2
      Free walkthrough at your location

      We visit your current space and your new space to get an accurate picture of everything involved.

    3. 3
      Detailed proposal — no surprises

      Full breakdown: inventory, truckloads, all rates. Nothing vague, nothing hidden.

    4. 4
      You compare and decide

      No pressure. Most clients get 3–4 bids. We're confident in our proposal.

    WBENC · WOSB · HUB · BBB A+

    Certified for Fortune 500 and government procurement

    What you get, free

    • On-site walkthrough of both locations
    • Written fixed-scope proposal
    • Building Certificate of Insurance, typically within one business day, at no charge
    • Workstation numbering and labeling plan
    Loading form…